LOW PUE FOR NEWCROSS HOSPITAL NEW DATA CENTRE

Newcross hospital in Wolverhampton have recently built a new Data centre and they have used a system of 2 no. EcoCooling units to provide the cooling.

These will provide over 60KW of low carbon cooling to the area for a total input power requirement of only 3.5KW.

The system consists of 2 no. stacked coolers blowing into the cold aisle of the area and 2 no. Celsius wall mounted extraction units to extract from the hot aisles.

Celsius undertook the complete installation including power and water supplies to both EcoCoolers and all controls.

The whole installation will pay for itself in less than 2 years, saving over 120 tonnes of carbon per annum and go some way to meeting the hospitals strict Carbon reduction targets.

LHASA USE ECOCOOLING IN THEIR NEW DATA CENTRE

Celsius have recently installed an EcoCooling system for Lhasa Limited in Leeds, Lhasa Limited have recently moved to a Leeds city centre office block and we have recently install a full EcoCooling system in their purpose built Data Centre.

The whole installation will pay for itself in less than 18 months and help in lowering their Carbon footprint.

The EcoCooling system provides 30KW of cooling and will save over 60 tonnes of carbon per annum.

WARWICK HOSPITAL JOINS THE GREEN ECOCOOLING REVOLUTION

Warwick hospital have installed an EcoCooling system in their on site Data centre. The system replaces the 4 no. 10KW spilt air conditioning units currently used,each of these has a 32 amp electrical feed, compared to the 16 amp feed to the new EcoCooling system, this results in a saving to the hospital of over 90% on their current electricity bills.

This equates to a saving of over 50 tonnes of carbon, going some way to meeting their Carbon Reduction targets.

DURHAM COUNCIL INSTALL ECOCOOLING IN THEIR MAIN DATA CENTRE

Durham Council have fitted 12 Celsius EcoCooling units and 12 Celsius extraction fans to their Data Centre in Durham.

The area was previously cooled using 4 standard DX floor mounted CRAC systems providing nearly 360KW of cooling and costing many thousands to operate and maintain.

Each EcoCooler in this application is estimated to save over £9,000.00 per annum and over 60 tonnes of Carbon per annum.

Celsius undertook the complete installation including power and water supplies with no downtime in a live Data Centre.

The whole installation will pay for itself in less than 2 years and go along way to meeting the Councils strict Carbon reduction targets.

There was also a requirement for increased filtration so wrap round EU5 filtration sections were fitted. These are easily cleanable and will both reduce maintenance times and also extend the life of the Celdek Evaporative cooling pads in the units

 NEW DATA CENTRE AT RUGBY SCHOOL INSTALLS ECOCOOLING

Rugby School, the founding home of the game Rugby Union, has installed an EcoCooling system in it’s new ‘state of the Art’ data centre.

The system consists of a floor mounted cooler and a wall mounted extraction fan, linked to an internal control system.

The system was specified and designed by the market leading Data centre fit out company, Comms Room Services Limited, who constructed and delivered the facility for Rugby School.

The system provides over 35KW of cooling to the area and uses our unique ‘dual feed’ system to ensure total N+1 resilience. By powering the extraction system independently, if there should be a problem with the cooler, thus ensuring at least some cooling in the area at all times.

There is also an external alarm facility, both audible and visible to ensure the alarm is picked up should there be a fault.

The system has worked very well even during the warmest spells and costs less than £2.00 per day to run on the warmest days.

ECOCOOLING FOR BROMLEY COUNCILS MAIN DATACENTRE

Bromley Council have recently installed a system of EcoCooling evaporative coolers to cool their main Data Centre.

The Celsius EcoCoolers have replaced the two existing Denco Computer Room Air Conditioning units (CRAC’s), however, these have been retained to provide the N+1 backup required for the Data Centre.

Bromley are striving to reduce their overall Carbon emissions, the installation of the Celsius EcoCooling system will save over 120 tonnes of Carbon per annum and over £20,000.00 in electricity running costs.

The Celsius system utilises two wall mounted EcoCooling units and two wall mounted extraction fans. Cold aisle containment was installed as part of the system and each cooler has an ‘attemperation’ section fitted to entrain some internal warm air to mix with the entering cold air in the winter months to ensure the correct conditions are maintained year round within the Data Centre. The system also utilises the Celsius ‘Pulse’ control system to ensure wintertime conditions are within specification.

Celsius fully installed the system without any down time within a live Data Centre, including all builders work, electrical wiring (with sub metering), water pipework, supporting steelwork, cold aisle containment, ducting and interlinking the existing CRAC units and all commissioning.

All project staff at Bromley were delighted with the Celsius installation after some misgivings about carrying out such an involved installation in such a sensitive area

LOW PUE FOR NEWCROSS HOSPITAL NEW DATA CENTRE

Newcross hospital in Wolverhampton have recently built a new Data centre and they have used a system of 2 no. EcoCooling units to provide the cooling.data centre cooling

These will provide over 60KW of low carbon cooling to the area for a total input power requirement of only 3.5KW.

The system consists of 2 no. stacked coolers blowing into the cold aisle of the area and 2 no. Celsius wall mounted extraction units to extract from the hot aisles.

Celsius undertook the complete installation including power and water supplies to both EcoCoolers and all controls.

The whole installation will pay for itself in less than 2 years, saving over 120 tonnes of carbon per annum and go some way to meeting the hospitals strict Carbon reduction targets.

SHEFFIELD CHILDRENS HOSPITAL HAS GREENEST DATA CENTRE IN THE NHS

Sheffield Children’s Hospital has the lowest PUE of any Data centre in the NHS after installing 6 EcoCooling systems in their new ‘state of the art’ Data centre in Sheffield city centre.

The Data Centre was constructed on top of the existing 5 story Sheffield Children’s hospital, using a light weight construction, the EcoCoolers were installed around the periphery and the fresh filtered cool air is ducted under the floor into the cold aisles.

The warm air is then extracted out at high level and, if required, mixed with the incoming cool air to provide the air onto the data racks at exactly the right temperature.

The whole installation will pay for itself in less than 2 years, saving over 290 tonnes of carbon per annum and go some way to meeting the hospitals strict Carbon reduction targets.

ENVIRONMENT AGENCY GO GREEN

The Environment Agency have recently installed a system of EcoCooling in their Data Centre in Reading, this will save over 60 tonnes of carbon emissions from their two CRAC units that usually cool the area.

We removed one large pane of glass and replaced this will a colour co-ordinated panel, fully weatherproofed and then passed the duct through this panel, the ducting was also colour co-ordinated.

The whole installation will pay for itself in less than 18 months and help in lowering their Carbon footprint.

The EcoCooling system provides 30KW of cooling and links to the two existing CRAC units that now act as N+2 resilience, Celsius undertook the whole installation including electrics, water, builders work and all structural steelwork

ABERYSWYTH HEAD OFFICE DATA CENTRE ECOCOOLING SYSTEM WILL PAY FOR ITSELF IN UNDER 2 YEARS

Aberystwyth Council have fitted 2 Celsius EcoCooling units and 2 Celsius extraction fans to their head office Data Centre and their electricity usage figures for the first couple of months of use indicate that it will pay for itself in under 2 years.

The area was previously cooled using 2 standard DX CRAC systems providing nearly 50KW of cooling and costing many thousands to operate and maintain. Initial running cost figures are showing an annual saving of over £17,500.00 pa, they are also expecting to save several thousand pounds on the servicing costs of the system, as the EcoCooling system is far easier to maintain.

Celsius undertook the complete installation including power and water supplies with no downtime in a live Data Centre.

The EcoCoolers are mounted on the 15m high roof and ducted down the front of the building in colour co-ordinated ducting.

WARWICK UNIVERSITY – 30KW IT SERVICES ROOM COOLING

Warwick University have drastically reduced their electrical consumption, and Carbon footprint, in one of their IT Rooms by installing a Celsius EcoCooling evaporative cooling system.

The Room was previously cooled using three 10KW Daikin wall mounted air conditioning units, each drawing upto 30 amps, the Celsius system draws less than 5amps when providing the same level of cooling.

Post Installation Survey Results – 21st June 2010.

External temp 25Co (warm clear sunny day)

Entering temp through the cooler 14.2Co

Internal Room temp 21Co

Extraction temperature 22Co

These temperatures are provided by using less than 1.5KW of energy. Evaporative cooling is the most cost effective way of cooling Data centres and also the most environmentally friendly.

Our Latest Jobs

Aberystwyth Council

Three years ago Celsius installed an EcoCooling Data centre cooling system for Aberystwyth Council at their Aberaron data centre, it worked that well delivering all the savings promised (over 80 tonnes of carbon per annum) as part of their carbon reduction program, therefore, when the cooling system in their main Data centre in their state of the art head office required a new back up system they approached us for our innovative solution.

Read more

Go Outdoors

Celsius have recently installed evaporative cooling systems for 6 Go Outdoors stores that suffered from severe summer overheating problems, the first was at Taunton and as this was so successful the Oxford store soon followed. The Celsius EcoCooling evaporative cooling approach has now been established as the Go Outdoor’s chosen solution for all of their stores, it fits in perfectly with their low carbon approach.

Read more